🔍 CVE-2026-52980

5.5
CVSS Score
MEDIUM
2026-06-24
2026-07-14 16:51
✅ 완료

🇰🇷 한글 설명

Linux 커널의 스케줄러(sched/fair)에서 프로세스 복제(fork) 시 sched_entity의 rel_deadline 값이 초기화되지 않아 발생하는 취약점입니다. 이로 인해 잘못된 vruntime 값이 계산되어 정수 오버플로가 발생하며, 결과적으로 커널 패닉이나 NULL 포인터 역참조로 인한 시스템 충돌을 유발할 수 있습니다.

💡 쉬운 설명

새로운 프로세스를 만들 때 이전 프로세스의 잘못된 시간 정보가 그대로 전달되어 컴퓨터의 계산 오류를 일으킵니다. 이 오류가 쌓이면 시스템이 갑자기 멈추거나 꺼질 수 있습니다.

🇺🇸 원문 (English)

In the Linux kernel, the following vulnerability has been resolved: sched/fair: Clear rel_deadline when initializing forked entities A yield-triggered crash can happen when a newly forked sched_entity enters the fair class with se->rel_deadline unexpectedly set. The failing sequence is: 1. A task is forked while se->rel_deadline is still set. 2. __sched_fork() initializes vruntime, vlag and other sched_entity state, but does not clear rel_deadline. 3. On the first enqueue, enqueue_entity() calls place_entity(). 4. Because se->rel_deadline is set, place_entity() treats se->deadline as a relative deadline and converts it to an absolute deadline by adding the current vruntime. 5. However, the forked entity's deadline is not a valid inherited relative deadline for this new scheduling instance, so the conversion produces an abnormally large deadline. 6. If the task later calls sched_yield(), yield_task_fair() advances se->vruntime to se->deadline. 7. The inflated vruntime is then used by the following enqueue path, where the vruntime-derived key can overflow when multiplied by the entity weight. 8. This corrupts cfs_rq->sum_w_vruntime, breaks EEVDF eligibility calculation, and can eventually make all entities appear ineligible. pick_next_entity() may then return NULL unexpectedly, leading to a later NULL dereference. A captured trace shows the effect clearly. Before yield, the entity's vruntime was around: 9834017729983308 After yield_task_fair() executed: se->vruntime = se->deadline the vruntime jumped to: 19668035460670230 and the deadline was later advanced further to: 19668035463470230 This shows that the deadline had already become abnormally large before yield_task_fair() copied it into vruntime. rel_deadline is only meaningful when se->deadline really carries a relative deadline that still needs to be placed against vruntime. A freshly forked sched_entity should not inherit or retain this state. Clear se->rel_deadline in __sched_fork(), together with the other sched_entity runtime state, so that the first enqueue does not interpret the new entity's deadline as a stale relative deadline.

📍 영향받는 시스템

Linux Kernel (sched/fair 관련 모듈을 사용하는 버전)

⚔️ 공격 벡터

특정 스케줄링 조건(sched_yield 호출 등)을 유도하여 커널 내 정수 오버플로 및 NULL dereference 유발

🛡️ 대응 방법

Linux 커널을 최신 보안 패치가 적용된 버전으로 업데이트하여 __sched_fork() 함수 내 rel_deadline 초기화 로직을 적용해야 함

🔧 검증 코드

출력된 커널 버전을 확인하여 해당 취약점이 해결된 패치 버전인지 배포판 보안 공지를 통해 대조함

Shell / Script
uname -r

📊 CVSS Vector String

CVSS Vector
CVSS:3.1/AV:L/AC:L/PR:L/UI:N/S:U/C:N/I:N/A:H

💻 영향받는 소프트웨어

Linux Kernel